A development programme needs a coordinated design and delivery brief. Define the building system, repeated units and site responsibilities before treating manufacture as a standalone purchase.
Discuss your development programme
Start with the programme
Tell us the site country, building types, current design stage and proposed phasing. Identify repeated layouts and the decisions that may differ between units. This helps separate standardised components from site-specific or architectural requirements without assuming every house in the programme is identical.
Coordinate the project team
Architectural design, structural information, local approvals and production details need an agreed exchange of information. Name the project participants responsible for each interface. Changes should be reviewed before they affect the package being manufactured or the sequence of work on site.
Compare elements and modules
Separate timber elements and volumetric modules provide different delivery routes. Discuss the configuration, completion level and local work required by each. The proposal should identify the actual package and responsibility boundaries, rather than use a broad turnkey label to cover unresolved work.
Plan phased delivery and assembly
The site programme needs to account for access, foundations, lifting, storage, weather protection and connections. Agree how readiness is communicated and how the supply sequence fits the building stages. Dates and capacity should be confirmed for the defined programme rather than borrowed from an unrelated archive project.
Use a relevant residential reference
The Vendelsö village materials offer an existing residential reference for discussing planning and execution. Explore the project and the wider archive, then use your own drawings and scope to establish what can be repeated, adapted or supplied in the current programme.
Agree the delivery scope.
Define these responsibilities in the project quotation before production starts.
| Project topic | What to agree |
|---|---|
| Design and approvals | Agree the architectural and structural documents, local approval responsibilities and drawing revision. |
| Foundations and connections | Confirm the foundation, tolerances, fixing interfaces and who prepares the site. |
| Timber structure and envelope | Specify the elements, insulation, windows, roof interfaces and weather protection. |
| Transport, lifting and assembly | Agree access, delivery sequence, lifting arrangements and installation responsibilities. |
| Finishes and building services | Define finishes, ventilation, heating, electrical and plumbing responsibilities in the quotation. |
See the work.
Explore the project archiveBefore we start.
Can repeated units use a common specification?
Discuss the common design and the site-specific decisions so repeatability and exceptions are clear.
Does an earlier development establish current capacity?
No. The programme, capacity and dates need confirmation for the current offer.
Discuss your development programme.
Tell us your country, project stage and intended building use. The proposal will define the design responsibilities, manufacturing scope and next steps for your brief.