Custom Timber Frame Houses
Your house can start with your own brief or an existing architectural design. The next step is to make the design responsibilities and manufacturing interfaces clear.
Discuss your custom design
Start with an idea or existing drawings
If you have a site and a broad idea, describe how you want to use the home, the setting and your priorities. If an architect has already prepared drawings, share the current revision and explain which decisions remain open. These starting points need different reviews; neither requires a catalogue layout to be treated as the final design.
Review what can be adapted
Discuss the layout, building form, facade, openings and material choices in the context of timber-frame manufacture. Changes have structural, envelope and delivery implications. Agree which options can be developed for the actual brief rather than assuming every detail is interchangeable.
Assign design responsibilities
The architectural design, structural documentation, local approvals and production details need named responsibilities. Where your architect or local engineer remains involved, define the information exchanged and the points at which decisions are approved. Existing drawings are an input to that coordination, not a substitute for it.
Review the brief before manufacture
Use the initial discussion to identify missing information and the requested package. A quotation should make the specification and work boundaries understandable. Agree the drawings and outstanding decisions before manufacture; later changes should be reviewed against their effects on the construction and programme.
Explore an individual residential reference
Mārupe’s visualisations and plan materials show an architectural approach shaped around living spaces, glazing and a terrace. Use the implemented project as a discussion reference while keeping your own design and specification distinct.
Agree the delivery scope.
Define these responsibilities in the project quotation before production starts.
| Project topic | What to agree |
|---|---|
| Design and approvals | Agree the architectural and structural documents, local approval responsibilities and drawing revision. |
| Foundations and connections | Confirm the foundation, tolerances, fixing interfaces and who prepares the site. |
| Timber structure and envelope | Specify the elements, insulation, windows, roof interfaces and weather protection. |
| Transport, lifting and assembly | Agree access, delivery sequence, lifting arrangements and installation responsibilities. |
| Finishes and building services | Define finishes, ventilation, heating, electrical and plumbing responsibilities in the quotation. |
See the work.
Explore the project archiveBefore we start.
Can I bring my architect’s drawings?
Yes. Share their current revision so the design and manufacturing interfaces can be discussed.
Does an individual design include local approvals?
Approval responsibilities must be agreed for the project and destination; they are not assumed to be included.
Discuss your custom design.
Tell us your country, project stage and intended building use. The proposal will define the design responsibilities, manufacturing scope and next steps for your brief.